ARG Temperature Shutter Change

Posted on Thursday, October 4th, 2018

ARG,

The following Folsom Dam Temperature Shutter Change Order was issued by Peggy Manza on 10/3/2018:

This is to document that Unit 3 was put  in configuration 4 at approx 10 am on Thursday September 27, 2018.

Configuration after changes:

 

Upper shutters – Units 1, 2, and 3 up

Middle shutters –  Units 1, 2, and 3 up

Lower shutters – Units 1 and 3 up, Unit 2 down

 

Comment: Temperature management in the Lower American River

PostedThursday, October 4th, 2018